Water heating installation precautions

<

More and more owners choose to warm the water in the decoration as home heating facilities, warm heating comfort, energy saving, very suitable for home heating life, but also on the health of the elderly play a role, saying "no cold feet warm." This kind of bottom-up warmth is also in line with some principles of Chinese medicine. Need to be installed to warm the construction details in order to protect the latter heating, if installed properly, post-heating effect is not only difficult to protect, but also very troublesome to repair, the following together warm water installation and construction details.



Water heating installation details one: pre-installation

Prior to the formal paving of the ground facilities, the design drawings should be confirmed and the site should be cleaned up. Then install the temperature control line and sub-collector, these processes are also very important, which involves the slot, assembly and so on. These issues are related to the normal use of warmth in the future and must be properly and standardly installed.

Water heating installation details II: Preparation

Warm-up installation preparation: clean up the construction site after entering the site, and determine the installation positions of the main engine (wall-hung boiler) and the sub-water collector, so as to prepare for the subsequent construction.

Water heating installation details three: full installation

After the temperature control line is buried and the sub-water collector is installed at the designated position, the ground insulation and heating pipes can be laid. Although these parts do not seem difficult, in fact, some of the small details are important. For example, after the surface pipes are laid, acceptance tests should also be carried out to ensure normal use.

Water heating installation details 4: laying insulation

First, cut the insulation board according to the actual size, and then lay it. When laying, leave a gap for the pipeline.

First spread the insulation board, and then lay the reflection film. The insulation board shall be tightly adhered when laying, and the edges of the two reflective films shall also be adhered with tape.

Then lay the wire mesh on the top, the edges of the two fast steel meshes should be connected with a special tie, and finally the pipe can be installed.



Water heating installation details 5: laying pipes

To prevent heat loss, must be for the sub - catchment length of tubing to put special installation room insulation sleeve; the jacket pipe insulation sleeve connected to the sub - at the sump and connected to a conduit in its The temperature control valve; when paving the pipeline, the corners of the pipeline must be carefully tied with a tie, and then use a special plastic card to fix it to prevent loosening; after the pipe is laid, put the pipe on the cover again The return-splitter is fixed so that the warm pipes are all laid.

Water heating installation details 6: pressure test

Inject cold water into the paved pipeline. After the pipeline is filled with water, use a special pressure machine to drive 10 kg of pressure. After 24 hours of sealing, if the pressure of the pipeline is not less than 6kg at this time, it means that the pipeline has no leakage and can be used normally.

Shanghai Shure Environmental Technology Co., Ltd. Tel

Needle Roller And Axial Ball Bearing

Axial Ball Bearing,Axial Needle Roller Bearing,Nkx Combined Ball Bearings,Needle Roller And Axial Ball Bearing

Changzhou Fangya bearing Co.,LTD , https://www.czfybearing.com